Eliminate Your Electricity Bill
Special Offer Below - $1,850 Value
-
Licensed Professionals
-
A+ Accredited Business with the BBB
-
5 Star Rating
-
Orange County's #1 Premium Solar Installer
Andrew Higgins - CEO
SunGrid Solar is Orange County's #1 premium solar panel and battery storage solutions company. We help homeowners and businesses lower or eliminate their monthly electric bills by capturing the sun's light and converting it to clean renewable energy. What sets SunGrid Solar apart from other solar companies is our alternative approach to energy by focusing on three key phases: Reduction - Production - Aggregation. The combination of these three key points is the future in energy savings.
WHAT OUR CUSTOMERS SAY ABOUT US
SOLAR CAN COST LESS THEN WHAT YOU CURRENTLY PAY FOR ELECTRICITY.
If your electricity bill is over $100, solar is right for you. There are many ways to purchase a solar system. You can pay cash upfront to see the quickest return on your investment, or you can take out a solar loan that will cost less then what you are currently paying to the utility company. Whatever way you decide to pay for your solar system, you can start with no money out of pocket and not have to pay the utility companies rising rates.
EASY PROCESS
30 - 45 DAYS FROM START TO FINISH
The Most Powerful Residential Solar Panel On The Market
Wattage
340W
Weight
43.9lbs
Frame
Black anodized aluminum
Dimensions
68.5 × 40.6 × 1.26in
25-year product and
linear performance warranty
Certifications
UL 1703, CE-Compliant,
IEC 61215, IEC 61730
At least 98% of nominal power during the first year. Thereafter max. 0.54% degradation per year. At least 93.1% of nominal power up to 10 years. At least 85% of nominal power up to 25 years.
The Solar Installation Process
The installation itself will take 1-3 days. Leading up to the solar installation we will draw plans to be approved by you before permits are pulled. Once permits are pulled, the installation will occur. After the installation, a city inspector will come to your home and inspect the system. The final step is receiving approval from the electric company. Since we are connecting the solar system to the grid, your utility company needs to approve the system to enable net metering. This takes anywhere from 5-15 days. Finally, once you receive PTO or permission to operate from the electric company, you can turn your system on and benefit from the solar energy produced.
SPECIAL LIMITED TIME OFFER: $1,850 VALUE
FREE SMART HOME UPGRADE
-
Electric Vehicle Charger - $1,200 Value
-
Smart Wifi Plug's - $150 Value
-
Nest Thermostat - $300 Value
-
LED Retrofit - $200 Value
200
+
System's Installed
2,381,611
Trees Saved From C02 Offset
3,000
KW's Installed